empty and ready for some subfloor work

Finally able to get going on the trailer again! Been a long break and I am so excited to start working. I recently removed all of the windows which I am in the process of restoring with a wire brush attachment and vinegar. Today I removed the rest of the old visible plumbing, scraped the excess top coat of paint where it was built up, scrubbed the ceiling and other dirty panels, removed the roof vents, and started to take up one of the sub floor pieces in the front.

Next up will  be removing the entire subfloor and old plumbing, patching the belly pan where a big piece is missing, installing new insulation, plumbing, and plywood, and then comes the propane and water lines!

_DSC0389_DSC0390_DSC0391_DSC0392_DSC0393_DSC0394_DSC0395_DSC0396_DSC0397_DSC0398_DSC0399_DSC0400_DSC0401_DSC0402_DSC0403_DSC0404_DSC0405_DSC0406_DSC0407_DSC0408_DSC0409_DSC0410_DSC0411_DSC0412_DSC0414_DSC0415_DSC0416_DSC0417_DSC0418_DSC0419_DSC0420_DSC0421_DSC0422_DSC0423_DSC0424_DSC0425_DSC0426_DSC0427_DSC0428_DSC0429_DSC0430_DSC0431_DSC0432_DSC0433_DSC0434_DSC0435_DSC0436_DSC0437_DSC0439_DSC0440_DSC0441_DSC0442_DSC0443_DSC0444_DSC0445_DSC0446_DSC0447

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s